Difference between revisions of "Documents and Reports"

From gem
Jump to navigation Jump to search
(Add 2017 Mini-GEM SC Meeting minutes)
 
(24 intermediate revisions by 2 users not shown)
Line 1: Line 1:
''' Documents and Reports'''
+
== GEM Best Practice ==
  
 +
* [http://gem.epss.ucla.edu/mediawiki/pdf/GEM_BestPractices_22Sep2017.pdf GEM Best Practice]
  
'''Latest Reports'''
+
== GEM Anti-Harassment Policy ==
  
+
GEM is committed to ensuring that all participants in all GEM activities have an environment that is free from harassment. This policy applies to all attendees at GEM activities including scientists, students, guests, staff, and contractors participating in scientific sessions, auxiliary meetings, and social events associated with any GEM gathering or other activity. See the [http://gem.epss.ucla.edu/mediawiki/pdf/GEM-AntiHarassment-Policy-Updated.pdf GEM Anti-Harassment Policy] for details.
--
 
  
'''Archives'''
+
== Steering Committee Meeting Minutes ==
  
[http://gem.epss.ucla.edu/mediawiki/pdf/GI%20campaign%20notes-2006.pdf GEM Global Interactions Campaign Report 2006 Snowmass Meeting]
+
* [http://spc.igpp.ucla.edu/gem/pdf/2017-MiniGEM-SC-Minutes.pdf 2017 Mini-GEM Steering Committee Meeting Minutes]
  
Documents for Inner Magnetosphere/Storm Campaign
+
== White Papers ==
  
    * [http://gem.epss.ucla.edu/mediawiki/docs/plan.html Plan for GEM Inner Magnetosphere and Storms Campaign]
+
* [http://spc.igpp.ucla.edu/gem/pdf/GEMWhitePaper-2013.07.01.pdf The Geospace Environment Modeling Program: Need, Goals, Accomplishments, Implementation] by William Lotko (Lead), W. Jeffrey Hughes, Michael W. Liemohn and Katariina Nykyri. Published in July 2013
    * 4-Year Research Strategy: [http://gem.epss.ucla.edu/mediawiki/docs/overview.html Overview] | [http://gem.epss.ucla.edu/mediawiki/docs/strategy.html 1st Draft Strategy]
 
  
Documents for GGCM Campaign
+
== GEMstone ==
  
    * [http://spacibm.rice.edu/~toffo/ggcm/GGCM_Concept_Report.html GGCM Concept Study Report]
+
GEMstone is the most detailed archive of GEM activity centering on Summer Workshops. Starting from 2009 final reports from closing Focus Groups are published in separate GEMstone issues. See [[Newsletters|Newsletters]] for all electronic volumes published.
    * Draft GGCM Planning Document
 
  
Documents for Magnetosphere-Ionosphere Coupling Campaign
+
== GEM History ==
  
    * [http://gem.epss.ucla.edu/mediawiki/cedar2000.html Cedar Report]
+
* [http://gem.epss.ucla.edu/mediawiki/tutorial/2005/russell05.pdf ''GEM: Not Business As Usual'' by Chris Russell (2005)]
    * [http://gem.epss.ucla.edu/mediawiki/gem2000.html GEM Report]
+
* GEM 7-year Report: [http://gem.epss.ucla.edu/mediawiki/pdf/report%20first.pdf Report from the First GEM Campaigns 1991 - 1997]
  
Documents for Tail-Substorm Campaign
+
== GEM Campaign Reports ==
  
    * [http://gem.epss.ucla.edu/mediawiki/pdf/Lyons_2003%20GEM%20T-S%20FinalReport.pdf Report Upon The End Of The GEM Tail-Substorm Campaign]
+
'''Boundary Layer Campaign'''
 +
* [[Bibliography: GEM Boundary Layer Campaign 1990-1998]]
  
+
'''Tail-Substorm Campaign'''
 +
* [http://gem.epss.ucla.edu/mediawiki/pdf/Lyons_2003%20GEM%20T-S%20FinalReport.pdf Report Upon The End Of The GEM Tail-Substorm Campaign]
  
[[Bibliography: GEM Boundary Layer Campaign 1990-1998]]
+
'''Inner Magnetosphere Storms Campaign'''
  
[[Campaigns and Working Group Reports]]
+
* [http://gem.epss.ucla.edu/mediawiki/docs/plan.html Plan for GEM Inner Magnetosphere and Storms Campaign]
 +
* 4-Year Research Strategy: [http://gem.epss.ucla.edu/mediawiki/docs/overview.html Overview] | [http://gem.epss.ucla.edu/mediawiki/docs/strategy.html 1st Draft Strategy]  
  
[http://gem.epss.ucla.edu/mediawiki/committee.html Steering Committee Reports]
+
'''Magnetosphere-Ionosphere Coupling Campaign'''
 +
* [http://gem.epss.ucla.edu/mediawiki/cedar2000.html CEDAR Report 2000]
 +
* [http://gem.epss.ucla.edu/mediawiki/gem2000.html GEM Report 2000]
  
[http://gem.epss.ucla.edu/mediawiki/student.html Student Tutorials]
+
'''Global Interactions Campaign'''
 +
* [http://gem.epss.ucla.edu/mediawiki/pdf/GI%20campaign%20notes-2006.pdf GEM Global Interactions Campaign Report 2006 Snowmass Meeting]
  
History
+
'''GGCM Campaign'''
 +
* [http://spacibm.rice.edu/~toffo/ggcm/GGCM_Concept_Report.html GGCM Concept Study Report]
  
[[A Short History (1987-90)]]
+
== Links to Old Report Sites ==
  
[[GEM: A Program of solar Terrestrial Research in global Geosciences (1988)]]
+
* [[Campaigns and Working Group Reports]]
 
+
* [http://gem.epss.ucla.edu/mediawiki/committee.html Steering Committee Reports]
[http://gem.epss.ucla.edu/mediawiki/pdf/report%20first.pdf Report from the First GEM Campaigns 1991 - 1997]
+
* [http://gem.epss.ucla.edu/mediawiki/student.html Student Tutorials]
 
+
* [http://gem.epss.ucla.edu/mediawiki/pdf/GEMStructure.pdf GEM Structure in 2006]
[http://gem.epss.ucla.edu/mediawiki/pdf/GEMStructure.pdf 2006 Structure]
 

Latest revision as of 21:41, 26 February 2018

GEM Best Practice

GEM Anti-Harassment Policy

GEM is committed to ensuring that all participants in all GEM activities have an environment that is free from harassment. This policy applies to all attendees at GEM activities including scientists, students, guests, staff, and contractors participating in scientific sessions, auxiliary meetings, and social events associated with any GEM gathering or other activity. See the GEM Anti-Harassment Policy for details.

Steering Committee Meeting Minutes

White Papers

GEMstone

GEMstone is the most detailed archive of GEM activity centering on Summer Workshops. Starting from 2009 final reports from closing Focus Groups are published in separate GEMstone issues. See Newsletters for all electronic volumes published.

GEM History

GEM Campaign Reports

Boundary Layer Campaign

Tail-Substorm Campaign

Inner Magnetosphere Storms Campaign

Magnetosphere-Ionosphere Coupling Campaign

Global Interactions Campaign

GGCM Campaign

Links to Old Report Sites