Difference between revisions of "Documents and Reports"

From gem
Jump to navigation Jump to search
(Add 2017 Mini-GEM SC Meeting minutes)
 
(20 intermediate revisions by 2 users not shown)
Line 1: Line 1:
''' Documents and Reports'''
+
== GEM Best Practice ==
  
'''Latest Reports'''
+
* [http://gem.epss.ucla.edu/mediawiki/pdf/GEM_BestPractices_22Sep2017.pdf GEM Best Practice]
  
[[Steering Committee Report: Summer 2008]]
+
== GEM Anti-Harassment Policy ==
  
'''Report of 2008 Summer Workshop Activities'''
+
GEM is committed to ensuring that all participants in all GEM activities have an environment that is free from harassment. This policy applies to all attendees at GEM activities including scientists, students, guests, staff, and contractors participating in scientific sessions, auxiliary meetings, and social events associated with any GEM gathering or other activity. See the [http://gem.epss.ucla.edu/mediawiki/pdf/GEM-AntiHarassment-Policy-Updated.pdf GEM Anti-Harassment Policy] for details.
  
[[FG.1]]
+
== Steering Committee Meeting Minutes ==
  
[[FG.2]]
+
* [http://spc.igpp.ucla.edu/gem/pdf/2017-MiniGEM-SC-Minutes.pdf 2017 Mini-GEM Steering Committee Meeting Minutes]
  
'''Archives'''
+
== White Papers ==
  
[http://gem.epss.ucla.edu/mediawiki/pdf/GI%20campaign%20notes-2006.pdf GEM Global Interactions Campaign Report 2006 Snowmass Meeting]
+
* [http://spc.igpp.ucla.edu/gem/pdf/GEMWhitePaper-2013.07.01.pdf The Geospace Environment Modeling Program: Need, Goals, Accomplishments, Implementation] by William Lotko (Lead), W. Jeffrey Hughes, Michael W. Liemohn and Katariina Nykyri. Published in July 2013
  
Documents for Inner Magnetosphere/Storm Campaign
+
== GEMstone ==
  
    * [http://gem.epss.ucla.edu/mediawiki/docs/plan.html Plan for GEM Inner Magnetosphere and Storms Campaign]
+
GEMstone is the most detailed archive of GEM activity centering on Summer Workshops. Starting from 2009 final reports from closing Focus Groups are published in separate GEMstone issues. See [[Newsletters|Newsletters]] for all electronic volumes published.
    * 4-Year Research Strategy: [http://gem.epss.ucla.edu/mediawiki/docs/overview.html Overview] | [http://gem.epss.ucla.edu/mediawiki/docs/strategy.html 1st Draft Strategy]
 
  
Documents for GGCM Campaign
+
== GEM History ==
  
    * [http://spacibm.rice.edu/~toffo/ggcm/GGCM_Concept_Report.html GGCM Concept Study Report]
+
* [http://gem.epss.ucla.edu/mediawiki/tutorial/2005/russell05.pdf ''GEM: Not Business As Usual'' by Chris Russell (2005)]
    * Draft GGCM Planning Document
+
* GEM 7-year Report: [http://gem.epss.ucla.edu/mediawiki/pdf/report%20first.pdf Report from the First GEM Campaigns 1991 - 1997]
  
Documents for Magnetosphere-Ionosphere Coupling Campaign
+
== GEM Campaign Reports ==
  
    * [http://gem.epss.ucla.edu/mediawiki/cedar2000.html Cedar Report]
+
'''Boundary Layer Campaign'''
    * [http://gem.epss.ucla.edu/mediawiki/gem2000.html GEM Report]
+
* [[Bibliography: GEM Boundary Layer Campaign 1990-1998]]
  
Documents for Tail-Substorm Campaign
+
'''Tail-Substorm Campaign'''
 +
* [http://gem.epss.ucla.edu/mediawiki/pdf/Lyons_2003%20GEM%20T-S%20FinalReport.pdf Report Upon The End Of The GEM Tail-Substorm Campaign]
  
    * [http://gem.epss.ucla.edu/mediawiki/pdf/Lyons_2003%20GEM%20T-S%20FinalReport.pdf Report Upon The End Of The GEM Tail-Substorm Campaign]
+
'''Inner Magnetosphere Storms Campaign'''
  
+
* [http://gem.epss.ucla.edu/mediawiki/docs/plan.html Plan for GEM Inner Magnetosphere and Storms Campaign]
 +
* 4-Year Research Strategy: [http://gem.epss.ucla.edu/mediawiki/docs/overview.html Overview] | [http://gem.epss.ucla.edu/mediawiki/docs/strategy.html 1st Draft Strategy]
  
[[Bibliography: GEM Boundary Layer Campaign 1990-1998]]
+
'''Magnetosphere-Ionosphere Coupling Campaign'''
 +
* [http://gem.epss.ucla.edu/mediawiki/cedar2000.html CEDAR Report 2000]
 +
* [http://gem.epss.ucla.edu/mediawiki/gem2000.html GEM Report 2000]
  
[[Campaigns and Working Group Reports]]
+
'''Global Interactions Campaign'''
 +
* [http://gem.epss.ucla.edu/mediawiki/pdf/GI%20campaign%20notes-2006.pdf GEM Global Interactions Campaign Report 2006 Snowmass Meeting]
  
[http://gem.epss.ucla.edu/mediawiki/committee.html Steering Committee Reports]
+
'''GGCM Campaign'''
 +
* [http://spacibm.rice.edu/~toffo/ggcm/GGCM_Concept_Report.html GGCM Concept Study Report]
  
[http://gem.epss.ucla.edu/mediawiki/student.html Student Tutorials]
+
== Links to Old Report Sites ==
  
History
+
* [[Campaigns and Working Group Reports]]
 
+
* [http://gem.epss.ucla.edu/mediawiki/committee.html Steering Committee Reports]
[[A Short History (1987-90)]]
+
* [http://gem.epss.ucla.edu/mediawiki/student.html Student Tutorials]
 
+
* [http://gem.epss.ucla.edu/mediawiki/pdf/GEMStructure.pdf GEM Structure in 2006]
[[GEM: A Program of solar Terrestrial Research in global Geosciences (1988)]]
 
 
 
[http://gem.epss.ucla.edu/mediawiki/pdf/report%20first.pdf Report from the First GEM Campaigns 1991 - 1997]
 
 
 
[http://gem.epss.ucla.edu/mediawiki/pdf/GEMStructure.pdf 2006 Structure]
 

Latest revision as of 21:41, 26 February 2018

GEM Best Practice

GEM Anti-Harassment Policy

GEM is committed to ensuring that all participants in all GEM activities have an environment that is free from harassment. This policy applies to all attendees at GEM activities including scientists, students, guests, staff, and contractors participating in scientific sessions, auxiliary meetings, and social events associated with any GEM gathering or other activity. See the GEM Anti-Harassment Policy for details.

Steering Committee Meeting Minutes

White Papers

GEMstone

GEMstone is the most detailed archive of GEM activity centering on Summer Workshops. Starting from 2009 final reports from closing Focus Groups are published in separate GEMstone issues. See Newsletters for all electronic volumes published.

GEM History

GEM Campaign Reports

Boundary Layer Campaign

Tail-Substorm Campaign

Inner Magnetosphere Storms Campaign

Magnetosphere-Ionosphere Coupling Campaign

Global Interactions Campaign

GGCM Campaign

Links to Old Report Sites