Difference between revisions of "Documents and Reports"
(Add 2017 Mini-GEM SC Meeting minutes) |
|||
(26 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
− | + | == GEM Best Practice == | |
− | [http://gem.epss.ucla.edu/mediawiki/pdf/ | + | * [http://gem.epss.ucla.edu/mediawiki/pdf/GEM_BestPractices_22Sep2017.pdf GEM Best Practice] |
− | + | == GEM Anti-Harassment Policy == | |
− | + | GEM is committed to ensuring that all participants in all GEM activities have an environment that is free from harassment. This policy applies to all attendees at GEM activities including scientists, students, guests, staff, and contractors participating in scientific sessions, auxiliary meetings, and social events associated with any GEM gathering or other activity. See the [http://gem.epss.ucla.edu/mediawiki/pdf/GEM-AntiHarassment-Policy-Updated.pdf GEM Anti-Harassment Policy] for details. | |
− | |||
− | + | == Steering Committee Meeting Minutes == | |
− | + | * [http://spc.igpp.ucla.edu/gem/pdf/2017-MiniGEM-SC-Minutes.pdf 2017 Mini-GEM Steering Committee Meeting Minutes] | |
− | |||
− | + | == White Papers == | |
− | + | * [http://spc.igpp.ucla.edu/gem/pdf/GEMWhitePaper-2013.07.01.pdf The Geospace Environment Modeling Program: Need, Goals, Accomplishments, Implementation] by William Lotko (Lead), W. Jeffrey Hughes, Michael W. Liemohn and Katariina Nykyri. Published in July 2013 | |
− | |||
− | + | == GEMstone == | |
− | + | GEMstone is the most detailed archive of GEM activity centering on Summer Workshops. Starting from 2009 final reports from closing Focus Groups are published in separate GEMstone issues. See [[Newsletters|Newsletters]] for all electronic volumes published. | |
− | + | == GEM History == | |
− | [http:// | + | * [http://gem.epss.ucla.edu/mediawiki/tutorial/2005/russell05.pdf ''GEM: Not Business As Usual'' by Chris Russell (2005)] |
− | + | * GEM 7-year Report: [http://gem.epss.ucla.edu/mediawiki/pdf/report%20first.pdf Report from the First GEM Campaigns 1991 - 1997] | |
− | -- | ||
− | + | == GEM Campaign Reports == | |
− | [[Bibliography: GEM Boundary Layer Campaign 1990-1998]] | + | '''Boundary Layer Campaign''' |
+ | * [[Bibliography: GEM Boundary Layer Campaign 1990-1998]] | ||
− | [ | + | '''Tail-Substorm Campaign''' |
+ | * [http://gem.epss.ucla.edu/mediawiki/pdf/Lyons_2003%20GEM%20T-S%20FinalReport.pdf Report Upon The End Of The GEM Tail-Substorm Campaign] | ||
− | + | '''Inner Magnetosphere Storms Campaign''' | |
− | [http://gem.epss.ucla.edu/mediawiki/ | + | * [http://gem.epss.ucla.edu/mediawiki/docs/plan.html Plan for GEM Inner Magnetosphere and Storms Campaign] |
+ | * 4-Year Research Strategy: [http://gem.epss.ucla.edu/mediawiki/docs/overview.html Overview] | [http://gem.epss.ucla.edu/mediawiki/docs/strategy.html 1st Draft Strategy] | ||
− | + | '''Magnetosphere-Ionosphere Coupling Campaign''' | |
+ | * [http://gem.epss.ucla.edu/mediawiki/cedar2000.html CEDAR Report 2000] | ||
+ | * [http://gem.epss.ucla.edu/mediawiki/gem2000.html GEM Report 2000] | ||
− | [ | + | '''Global Interactions Campaign''' |
+ | * [http://gem.epss.ucla.edu/mediawiki/pdf/GI%20campaign%20notes-2006.pdf GEM Global Interactions Campaign Report 2006 Snowmass Meeting] | ||
− | [ | + | '''GGCM Campaign''' |
+ | * [http://spacibm.rice.edu/~toffo/ggcm/GGCM_Concept_Report.html GGCM Concept Study Report] | ||
− | + | == Links to Old Report Sites == | |
− | [http://gem.epss.ucla.edu/mediawiki/pdf/GEMStructure.pdf 2006 | + | * [[Campaigns and Working Group Reports]] |
+ | * [http://gem.epss.ucla.edu/mediawiki/committee.html Steering Committee Reports] | ||
+ | * [http://gem.epss.ucla.edu/mediawiki/student.html Student Tutorials] | ||
+ | * [http://gem.epss.ucla.edu/mediawiki/pdf/GEMStructure.pdf GEM Structure in 2006] |
Latest revision as of 21:41, 26 February 2018
Contents
GEM Best Practice
GEM Anti-Harassment Policy
GEM is committed to ensuring that all participants in all GEM activities have an environment that is free from harassment. This policy applies to all attendees at GEM activities including scientists, students, guests, staff, and contractors participating in scientific sessions, auxiliary meetings, and social events associated with any GEM gathering or other activity. See the GEM Anti-Harassment Policy for details.
Steering Committee Meeting Minutes
White Papers
- The Geospace Environment Modeling Program: Need, Goals, Accomplishments, Implementation by William Lotko (Lead), W. Jeffrey Hughes, Michael W. Liemohn and Katariina Nykyri. Published in July 2013
GEMstone
GEMstone is the most detailed archive of GEM activity centering on Summer Workshops. Starting from 2009 final reports from closing Focus Groups are published in separate GEMstone issues. See Newsletters for all electronic volumes published.
GEM History
- GEM: Not Business As Usual by Chris Russell (2005)
- GEM 7-year Report: Report from the First GEM Campaigns 1991 - 1997
GEM Campaign Reports
Boundary Layer Campaign
Tail-Substorm Campaign
Inner Magnetosphere Storms Campaign
- Plan for GEM Inner Magnetosphere and Storms Campaign
- 4-Year Research Strategy: Overview | 1st Draft Strategy
Magnetosphere-Ionosphere Coupling Campaign
Global Interactions Campaign
GGCM Campaign