Documents and Reports: Difference between revisions

From gem
Jump to navigation Jump to search
No edit summary
No edit summary
Line 6: Line 6:
   
   


<ul>Documents for Inner Magnetosphere/Storm Campaign
<ul><li> * Plan for GEM Inner Magnetosphere and Storms Campaign
<ul><li> * 4-Year Research Strategy: Overview | 1st Draft Strategy\\
Documents for GGCM Campaign
    * GGCM Concept Study Report
    * Draft GGCM Planning Document
Documents for Magnetosphere-Ionosphere Coupling Campaign
    * Cedar Report
    * GEM Report
Documents for Tail-Substorm Campaign
    * Report Upon The End Of The GEM Tail-Substorm Campaign
The First GEM Substorm Challenge
GEM Inner Magnetosphere Campaign Storms Pages





Revision as of 15:38, 25 March 2008